Documentation Center

Handling bilingual engineering tasks

The Bilingual Engineering task is meant for engineers who need to make changes to the project files before being evaluated for quote purposes and before any translation activity can begin.

About this task

During the Bilingual Engineering task, users can lock content, correct source content or perform other edit operations.
The Bilingual Engineering task:
  • Is positioned before the Analysis task.
  • Skipped by default.

Procedure

  1. Log in to Trados Team (by accessing this link: http://languagecloud.sdl.com/lc).
  2. Go to the Inbox view.
  3. Select the New tab.
  4. Identify the task and select the check box corresponding to the task row.
  5. Do one of the following:
    • If you don't want to check the task details, but want to start working straight away, select Accept.
    • If you want to check the task details (before accepting it), select the task, and in the [task_name] window, check the task details and select Accept.
  6. Select the Active tab.
  7. Identify the task and select the check box corresponding to the task row.
  8. Perform any of the following operations:
    • Work on the file in Trados Studio - Select the task, and then select Open in Studio.
    • Work on the file in Trados Online Editor - Select the task, and then select Open in Online Editor.
    • Download files for a task - Select the task, select More Actions, and then select Download.
    • Download all files from a project - Select the task, select More Actions, and then select Download all files from the project.
    • Upload files for task - Select the task, select More Actions, and then select Upload Files.
    • Upload offline package - Select the task, select More Actions, and then select Upload Package.
    • Download offline package - Select the task, select More Actions, and then select Download Package.
    • Rename project files - Select the task, select Open, and in the Files tab select the file, and then select Rename.
    • Add reference files to tasks - Select the task, select Open, and in the Files tab select Upload Reference Files.
  9. When finished, do one of the following:
    • If you select Done, the file moves on to the next task in the workflow.
    • If you select Send to Translation Memory Matching, the project TM reapplied on the file. If the workflow includes a Machine Translation task between the Translation Memory Matching task and the Bilingual Engineering task, the project MT resources are also reapplied on the file. After the TM and MT (if any) are applied, another Bilingual Engineering task is generated. A new Bilingual Engineering task is generated as many times as you select the Send to Translation Memory Matching transition. There is no restriction to the number of times you can select the Send to Translation Memory Matching transition. When you finished making all the changes on the file and you are happy with the number of times the TM and MT (if any) were reapplied, you can select the Done transition, which moves the file on to the next task in the workflow.
    • If you select Send to PerfectMatch, the project TM is reapplied on the file. If the workflow includes a Machine Translation task between the Translation Memory Matching task and the Bilingual Engineering task, the project MT resources are also reapplied on the file. After the TM and MT (if any) are applied, another Bilingual Engineering task is generated. A new Bilingual Engineering task is generated as many times as you select the Send to PerfectMatch transition. There is no restriction to the number of times you can select the Send to PerfectMatch transition. When you finished making all the changes on the file, you can select the Done transition, which moves the file on to the next task in the workflow.